Call Now : 1-877-522-5431
|
|
The watering control will monitor the battery voltage to determine when the battery charge is complete. After the charge has been completed, the control will allow water to flow to the battery for a fixed period of time depending on the battery voltage. The charger control (part # FC1000) can be mounted to the side or top of the charger, or on the front panel or door of the charger. The control is designed to operate with a gravity fed or pressure regulated supply system up to 15 psi. The plumbing supply lines should be copper, PVC, or plastic tubing. If the water supply consists of deionized water, optional plastic barb fittings must be used. The water supply line to the battery should only be connected once a week – not every time the battery is charged. Catalog |
| Home | News | Products | Catalog | Installation | Technical Info | Contact | Ordering | Mission Statement | |